Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›I.M. Skaugen Takes Delivery of Norgas Camilla (Norway)
Clean Fuel

September 16, 2011 · about 15 years ago

I.M. Skaugen Takes Delivery of Norgas Camilla (Norway)

The I.M. Skaugen Group (IMS) announced that the last of the three vessels in the Wintergas series has been successfully delivered. The vessel will complete its gas trial and enter the Norgas fleet as a combination of gas and chemical vessel. The delivery has increased the Group’s liquidity with USD3

2 minutes read
  • LinkedIn
  • X
  • Email

The I.M. Skaugen Group (IMS) announced that the last of the three vessels in the Wintergas series has been successfully delivered.

The vessel will complete its gas trial and enter the Norgas fleet as a combination of gas and chemical vessel. The delivery has increased the Group’s liquidity with USD33.5 mill and these funds will be applied to a reduction in working capital related debt employed by the Group’s ship building activity and this again improves the equity ratio.

The delay of the vessel was caused by fraud committed by the trading company – a joint Seller of the ship under the ship building contract. The vessel was originally completed with crew onboard and ready for delivery since May 2010. In addition to the operational loss, the USD 35 mill absorbed as working capital was not able to generate proper returns during the whole period where the vessel was detained. The vessel delivery was not achievable without constant support from the Chinese government that has applied their resources to resolve the complicated legal and political issues. Although Norgas Camilla has been delivered, I.M. Skaugen is still proceeding with the arbitration process at HKIAC (Hongkong International Arbitration Centre) for the economic loss we suffered from the delayed delivery.

Furthermore, the Multigas vessels Norgas Vision (12 000cbm) and Norgas Conception (10 000cbm) have completed their sea trials and these vessels will be delivered in October this year. The two vessels are capable of carrying both LNG and petrochemical gases. These deliveries mark the successful completion of company’s current newbuilding program. Under this program the company has by SMC – Skaugen Marine Construction – completed building on 12 gas carrying vessels in China out of which 9 has been retained by Norgas for its trading and 3 have been resold. Of the 9 vessels retained by Norgas, 6 of them are the Norgas unique design of LNG capable ethylene vessels and the other 3 vessels are with unique gas/chemical design.

[mappress]

Source: I.M. Skaugen, September 16, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free