Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Viktor Lenac Wins Contract to Convert SHCV Sampson into Crane and Pipelay Vessel (Croatia)
Subsea

September 19, 2011 · about 15 years ago

Viktor Lenac Wins Contract to Convert SHCV Sampson into Crane and Pipelay Vessel (Croatia)

Viktor Lenac Shipyard has been recently awarded a contract for the conversion of the vessel SHCV “SAMPSON” (managed by Cyprus’s „VShips“ and Great Britain’s „Zafiro Marine“) by “CARVAL INVESTORS”, a leading global alternative investment manager. The existing vessel is an offshore gas and oil field i

2 minutes read
  • LinkedIn
  • X
  • Email

Viktor Lenac Shipyard has been recently awarded a contract for the conversion of the vessel SHCV “SAMPSON” (managed by Cyprus’s „VShips“ and Great Britain’s „Zafiro Marine“) by “CARVAL INVESTORS”, a leading global alternative investment manager.

The existing vessel is an offshore gas and oil field installation vessel, built in 2010. She is 180 m long and 32 m wide, carrying a crane of 1.600 ton capacity. “SAMPSON” will be converted into a crane and pipelay vessel, one more conversion on Viktor Lenac’s respectable reference list of complex projects in conversion and offshore among which Helix Producer I, Seminole, Kommandor 3000 and others, establishing its position as one of the few specialized shipyards for ship conversions and gas platform construction in the entire region of the Mediterranean.

Six new Diesel generators (2200 kW each) will be installed in two independent engine rooms. New ship systems will be installed with more than 40 tons of piping. Two new thrusters will be installed i.w.o. existing fresh water tanks. HiPAP for dynamic positioning will be relocated in newly built structural trunks. New A&R winch room will be built and outfitted i.w.o. existing hold no.1.

Complete pipe laying equipment (tensioners, track supports, conveyors, pipe loader etc.) will be installed with hydraulic systems on main deck. A new pipe lay tunnel (300 t) and A-frame structure (276 t) will be built and installed. A new stinger structure (390 t) for laying offshore pipelines will be built.

The existing ship systems will be modified to accommodate new equipment, propulsion and power generation.

Two engine rooms, two switchboard rooms and two thruster rooms will be outfitted and HVAC system will be installed in new ship spaces.

More than 150 km of cables will be installed in total.

The superstructure will undergo considerable modification including gym, sauna, swimming pool etc.

[mappress] Source: Viktor Lenac Shipyard, September 19, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free