Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Petrobras Opens Up Deepest and Longest Undersea Pipeline in Brazil
Business & Finance

September 20, 2011 · about 15 years ago

Petrobras Opens Up Deepest and Longest Undersea Pipeline in Brazil

The Consortium operating Block BM-S-11, formed by Petrobras (65% – Operator) in partnership with BG Group (25%) and Petrogal Brasil S.A. – Galp Energia (10%), has opened up the Lula-Mexilhão gas pipeline. The system connects the Lula field to the Mexilhão platform, located in shallow Santos Basin wa

2 minutes read
  • LinkedIn
  • X
  • Email

The Consortium operating Block BM-S-11, formed by Petrobras (65% – Operator) in partnership with BG Group (25%) and Petrogal Brasil S.A. – Galp Energia (10%), has opened up the Lula-Mexilhão gas pipeline.

The system connects the Lula field to the Mexilhão platform, located in shallow Santos Basin waters. With a capacity to take off up to 10 million m3 gas per day, the pipeline will transport gas produced in the Pre-Salt Cluster.

This project is strategic for developing production in the Santos Basin Pre-Salt layer and to increase gas supply flexibility on the domestic market.

Lula-Mexilhão is an unprecedented milestone for Brazilian engineering. Extending over 216 kilometers, 18 inches in diameter and operating at a pressure of 250 bar, it is the deepest and longest undersea pipeline ever laid in Brazil.

It begins 2,145 meters below sea level, where it is connected to the Cidade de Angra dos Reis FPSO vessel (floating production, storage and offloading) in the Lula field, and terminates at the connection to the Petrobras’ Mexilhão platform, at a depth of 172 meters. Of strategic importance to Santos Basin logistics, the Mexilhão platform is the largest fixed production unit in Brazil.

The new pipeline will also play a part in taking off natural gas from the platforms involved in developing phase one of the Santos Basin Pre-Salt operations. To deploy the gas pipeline, it was necessary to analyze the conceptual design and make sure that capacity was adequate to meet market demand, as well as organizing very tight coordination among equipment suppliers, integrators and installers. Developing new suppliers and incorporating innovative designs for equipment and accessories were also essential to guarantee project viability.

The Lula-Mexilhão gas pipeline is linked to other Petrobras System facilities, including the pipeline connecting the Mexilhão field to the Monteiro Lobato Gas Treatment Unit (UTGCA) in Caraguatatuba (state of São Paulo) for transporting gas to the mainland, and the Caraguatatuba-Taubaté pipeline which transports processed gas to the domestic market distribution network.

Integration of the BM-S-11 Consortium’s Lula-Mexilhão gas pipeline with Petrobras’ existing facilities will be crucial for speeding up Brazilian Pre-Salt oil production.

[mappress] Source: Petrobras, September 20, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago