Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Norway: Det Norske Signs Three Contracts for Jette Development
Business & Finance

October 5, 2011 · about 15 years ago

Norway: Det Norske Signs Three Contracts for Jette Development

Det norske has signed three important contracts in preparing for the Jette development. The contractors are Cameron, Subsea7 and Aker Solutions. Det norske oljeselskap ASA presented a plan for development and operation (PDO) of Jette to the Minister of Petroleum and Energy, Ola Borten Moe. The PDO w

2 minutes read
  • LinkedIn
  • X
  • Email

Det norske has signed three important contracts in preparing for the Jette development. The contractors are Cameron, Subsea7 and Aker Solutions.

Det norske oljeselskap ASA presented a plan for development and operation (PDO) of Jette to the Minister of Petroleum and Energy, Ola Borten Moe. The PDO was submitted on behalf of the partners in the Jette Group, which in addition to Det norske as operator, includes Petoro, Dana Petroleum and Bridge Energy.

Aldous Senior Vice President Projects, Bård Atle Hovd , says this is an important step towards developing Jette.

“ We have now signed the third and final contract for the development phase. As soon as we receive the Ministry´s approval, we will embark on our first field development. We wish for a fast track development, enabling us to produce oil from Q1 2013.”

Jette is located in blocks 25/7 and 25/8, in the mid part of the North Sea. The field, which lies at a depth of 127 meters, will be produced with two horizontal wells, tied back to the Jotun floating production, storage and offloading vessel (FPSO).

Three suppliers

Det norske has signed supplier agreements with three contractors. Cameron has been selected to supply the subsea production system. They will, amongst other, fabricate the X-mas trees and protective structures.

Subsea 7 will be responsible for engineering, procurement, fabrication and installation of a 6 kilometer flexible flowline and jumpers, installation of a 6 kilometer integrated services umbilical, X-mas trees and protective structures. They will also supply diver assisted tie-ins.

Aker Solutions is given the assignment to fabricate the 6 kilometer integrated services umbilical.

Engineering and fabrication were initiated immediately after contract signing. The work is led by the Jette project management team situated in Trondheim and Stavanger (drilling operations). Offshore operations will, according to schedule, take place autumn 2012.

[mappress] Source: Det norske, October 05 , 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago