Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›The Netherlands: Wind Turbines to Reach Capacity of 20MW by 2020
Offshore Wind

December 5, 2011 · about 15 years ago

The Netherlands: Wind Turbines to Reach Capacity of 20MW by 2020

In 2020 wind turbines will reach a capacity of 20 MW. This is the conclusion of a feasibility study conducted within Europe’s Upwind wind power project . Giant wind turbines, with rotor having a 200 meter diameter and a capacity of 20 MW will be put into service by 2020. Significant technological in

2 minutes read
  • LinkedIn
  • X
  • Email

In 2020 wind turbines will reach a capacity of 20 MW. This is the conclusion of a feasibility study conducted within Europe’s Upwind wind power project .

Giant wind turbines, with rotor having a 200 meter diameter and a capacity of 20 MW will be put into service by 2020. Significant technological innovation and design will be then necessary, according to a feasibility study for the Upwind wind power project.

This increased capacity could offer important opportunities for the expansion of wind energy in Europe, especially through the construction of offshore wind farm parks, thus making it possible to achieve the goal of obtaining 26% to 34% of Europe’s electricity demand from wind power by 2030.

However, significant technological advances will have to be made, and the design will have to change: “Making a 20 MW wind turbine is not just upscaling today’s 5 MW machines. Nevertheless, we have already identified the necessary innovations in terms of design, materials and way the turbine is operator” , said Jos Beurskens of the Energy Research Centre Netherlands , who led the project.

For example, the blades will have a 200 meter diameter, compared with the 120 meters of current 5 MW turbines, though they will be lighter and more flexible. Moreover, they will have to be equipped with sensors that will indicate in real time how they must be oriented to best exploit the wind and can also check their tension.

Moreover, economic issues must be overcome, as regards the of research and development funding.: “This knowledge will never become reality if the EU does not make a clear commitment to research,” warns Christian Kjaer, CEO of the European Wind Energy Association (EWEA).

[mappress]

Source: evwind, December 05, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free