Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›OGX, OSX Expect Waimea Production Start in January 2012
Business & Finance

December 16, 2011 · about 14 years ago

OGX, OSX Expect Waimea Production Start in January 2012

OGX, the Brazilian oil and gas company responsible for the largest private-sector exploratory campaign in Brazil, and OSX, a private Brazilian corporation that provides equipment and services to the offshore oil and natural gas industry via integrated operations in naval construction, chartering of

2 minutes read
  • LinkedIn
  • X
  • Email

OGX, the Brazilian oil and gas company responsible for the largest private-sector exploratory campaign in Brazil, and OSX, a private Brazilian corporation that provides equipment and services to the offshore oil and natural gas industry via integrated operations in naval construction, chartering of exploration and production units, and operating and maintenance services, announced that they have revised the time-table for the beginning of production to January 2012.

During the second half of 2011, OGX has focused on the execution process in preparation for first oil, from obtaining the necessary environmental licenses until the installation of the equipment that will connect the OGX-26HP well to the FPSO OSX-1. The intense work on part of OGX’s and OSX’s team in this process has enabled the installation of 10 piles from the mooring system, 10 chains, the middle water arch and the disconnectable turret buoy. In addition, OGX is finalizing the installation of the flexible lines, thus concluding important steps that precede the arrival of the FPSO OSX-1 to the Waimea accumulation. Further, OSX’s team has been working on an extensive and careful equipment and system testing program aboard the FPSO OSX-1, which is moored in the port of Rio de Janeiro, in order to ensure the beginning of production in accordance with our high safety standards.

The main milestones for the beginning of production are:

(i) Dec. 25: Sail-away of the FPSO OSX-1 from the port of Rio de Janeiro

(ii)Dec. 26: Final inspection on the FPSO OSX-1

(iii)Jan. 7: Connection of the FPSO OSX-1 to the turret

(iv)Jan. 23: FPSO OSX-1 ready and beginning of production

[mappress] Source: Offshore Energy Today Staff, December 16, 2011; Image: OSX

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free