Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Foster Wheeler Signs Forties Pipeline System Contract
Business & Finance

December 21, 2011 · about 14 years ago

Foster Wheeler Signs Forties Pipeline System Contract

Swiss-based Foster Wheeler AG has been awarded an engineering, procurement and construction management contract by BP Exploration Operating Company Limited for BP Exploration’s Enhanced Gas Separation Project (EGSP) in Scotland. The Foster Wheeler contract value for the project was not disclosed. In

2 minutes read
  • LinkedIn
  • X
  • Email

Swiss-based Foster Wheeler AG has been awarded an engineering, procurement and construction management contract by BP Exploration Operating Company Limited for BP Exploration’s Enhanced Gas Separation Project (EGSP) in Scotland.

The Foster Wheeler contract value for the project was not disclosed. Interim releases of work were included in the company’s first, second and third-quarter 2011 bookings. The main release of EPCm work will be included in the fourthquarter 2011 bookings.

The project, for which Foster Wheeler has already successfully completed the pre-front-end design (pre-FEED) and FEED, relates to the debottlenecking of the Forties Pipeline System (FPS) crude degasification facilities at BP Exploration’s Kinneil terminal to allow it to handle high gas-to-oil ratio unstabilized crude oils and natural gas liquids (NGLs). The debottlenecking will involve modifications to the existing plant, including improvements to heater and process control systems, as well as new facilities, including crude coolers and a cooling water system. The project is expected to be completed in 2013.

The FPS is an integrated oil and gas liquid transportation and processing system, serving both UK and Norwegian sectors of the central and northern North Sea. BP Exploration has stated that the system has a nominal capacity in excess of one million barrels per day and carries around 40 percent of the UK’s oil production. Oil and gas liquids are transported into the system through pipelines from over 30 offshore fields and the St. Fergus gas terminal.

Foster Wheeler has worked closely with BP throughout the design phase and has also supported BP when presenting the project status to other oil companies who are participants in the Forties Pipeline System.

[mappress] Offshore Energy Today Staff, December 21, 2011 Image:BP

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free