Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Norway: Mooring Systems Installs Flexible Flowline at Valhall
Business & Finance

December 23, 2011 · about 14 years ago

Norway: Mooring Systems Installs Flexible Flowline at Valhall

Moorings Systems has completed the installation of a flexible export flowline to transfer water to a DP tanker at the BP Valhall platform complex in the Norwegian North Sea. The project involved installation of 1,160 metres, 6” flexible flowline, front end engineering, mobilisation of equipment, and

2 minutes read
  • LinkedIn
  • X
  • Email

Moorings Systems has completed the installation of a flexible export flowline to transfer water to a DP tanker at the BP Valhall platform complex in the Norwegian North Sea. The project involved installation of 1,160 metres, 6” flexible flowline, front end engineering, mobilisation of equipment, and offshore installation team.

Located in 70 m of water, the Valhall complex consists of five separate, bridge-connected, steel platforms for quarters, drilling, wellheads, production and water injection respectively. In addition the field has two unmanned flank platforms, one in the south and one in the north, both around 6 kilometers from the field centre.

From its Montrose quayside facility, Mooring Systems deployed a 150t spooler containing five sections of Manulli hose (3 x 300m, 120m and 140m) on the DP vessel Olympic Zeus. The flowline was connected to the production platform using a specially designed ‘hang off spool’ fitted to the end of the hose and the 1,160 m hose laid along the sea bed away from the platform.

A 20” Pusnes connector was fitted to the end of the hose, and laid on the sea bed complete with pick up rope and marker buoys, for subsequent retrieval by DP tanker. The flowline was then leak tested and covered with concrete mud mats.

“Our Montrose team has considerable experience of this type of project in the North Sea, and so we were able to quickly respond to BP’s flowline installation request,” says Doug Davidson, managing director, Mooring Systems Ltd.

[mappress] Offshore Energy Today Staff, December 23, 2011; Image: Mooring Systems

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago