Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Australia: Thiess Bags Wheatstone Work
Project & Tenders

December 28, 2011 · about 14 years ago

Australia: Thiess Bags Wheatstone Work

Thiess has won a $60 million contract to deliver infrastructure for the Chevron-operated Wheatstone Project in Western Australia. Thiess will construct a 1.2 kilometre long tunnelled shore crossing under the ocean which will connect two offshore gas reserves with Chevron’s greenfield LNG plant at As

2 minutes read
  • LinkedIn
  • X
  • Email

Thiess has won a $60 million contract to deliver infrastructure for the Chevron-operated Wheatstone Project in Western Australia.

Thiess will construct a 1.2 kilometre long tunnelled shore crossing under the ocean which will connect two offshore gas reserves with Chevron’s greenfield LNG plant at Ashburton North near Onslow in the state’s north west.

Managing Director Bruce Munro welcomed the Wheatstone shore crossing contract. “ Thiess already has a major role with Chevron in delivering its Gorgon LNG project and we’re delighted to be increasing our participation in the LNG industry, ” Mr Munro said.

The Wheatstone shore crossing micro-tunnel will be 2.5 metres in diameter and will be delivered by tunnel boring machine and lined by the pipe jacking method.

The micro-tunnel will accommodate a 1.1 metre diameter pipeline to deliver gas from Chevron’s Wheatstone and Iago reserves.

General Manager Tunnelling, Glen Ashton said Thiess is delighted to have been able to provide Chevron with solutions to some of the challenges of the project. “ We have a great relationship with the Chevron team and we’re excited to be playing such a significant role in such a large LNG project, ” Mr Ashton said.

“ This is an exciting project for Western Australia and Thiess is committed to engage local suppliers and subcontractors which will in turn boost local employment and training opportunities .”

Engineering and procurement commences immediately for the design of the TBM launch shaft, jacking pipes, and TBM retrieval pit. Construction on site will commence after the cyclone season in 2013.

[mappress]

LNG World News Staff, December 28, 2011; Image: Chevron

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

17 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

17 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

17 days ago