Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›PGS Begins MC3D Survey in Kwanza/Benguela Basins Offshore Angola
Subsea

January 11, 2012 · about 14 years ago

PGS Begins MC3D Survey in Kwanza/Benguela Basins Offshore Angola

The Ramform Valiant, a seismic vessel owned and operated by Petroleum Geo-Services ASA, has started acquisition of over 26,000 km² of GeoStreamer® data in five blocks in the Kwanza/Benguela Basins in Angola. The size of the survey area corresponds to an area slightly larger than Massachusetts or Wal

2 minutes read
  • LinkedIn
  • X
  • Email

The Ramform Valiant, a seismic vessel owned and operated by Petroleum Geo-Services ASA, has started acquisition of over 26,000 km² of GeoStreamer® data in five blocks in the Kwanza/Benguela Basins in Angola.

The size of the survey area corresponds to an area slightly larger than Massachusetts or Wales. Following the block awards made on December 20th, BP, Total and Statoil have been made operators of blocks 24, 25, 38, 39 and 40. Sonangol is a partner in all of the blocks.

Speeding up decision making

All four oil companies have committed to funding the survey.

With early access to 3D seismic data based on the most advanced seismic technology, the operators will benefit from clearer images and more time to plan the exploration wells that they are committed to drill within the next five years.

PGS commitment to Angola

PGS, in association with Sonangol, has a long history of investing in its latest technology in Angola. The Company will work closely with Sonangol to ensure this project not only delivers the data and time savings to the operators but also improves the collective understanding of the basin geology.

PGS already has 2D GeoStreamer data over this area, acquired in 2010, and good quality conventional 3D datasets over blocks 24 and 25 that PGS will re-process. Together these datasets will enable PGS to construct the best possible velocity model for processing of the new 3D GeoStreamer data.

On the job

In February, the PGS Apollo will join the Ramform Valiant and acquisition will continue with both vessels until Q4 2012. PGS teams will start processing data in March, utilizing the latest depth imaging technology and building on their experience of illuminating pre-salt targets in Angola. Together, the two vessels will operate 20 vessel months on this project. Previous PGS press releases in December summarizing vessel backlog included this project.

The Conjugate Margin

The salts basins of Angola have a clear geological link to similar basins offshore Brazil. Recent advances in tectonic reconstruction point to parallels with the prolific pre-salt Santos and Campos areas, and PGS will use its extensive MC library on both sides of the Atlantic to take a closer look at these links.

[mappress] Subsea World News Staff , January 11, 2012; Image: PGS

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free