Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Q10 to Select Developer for Dutch Offshore Wind Farm
Offshore Wind

January 13, 2012 · about 14 years ago

Q10 to Select Developer for Dutch Offshore Wind Farm

Q10 Offshore Wind B.V. (Q10) has obtained a permit for the construction and exploitation of an offshore wind farm in the Dutch Exclusive Economic Zone in the Q10 Sector. Q10 intends to include a limited number of innovative offshore wind turbines (WTG) in the wind farm by means of a concession contr

2 minutes read
  • LinkedIn
  • X
  • Email

Q10 Offshore Wind B.V. (Q10) has obtained a permit for the construction and exploitation of an offshore wind farm in the Dutch Exclusive Economic Zone in the Q10 Sector.

Q10 intends to include a limited number of innovative offshore wind turbines (WTG) in the wind farm by means of a concession contract.

In summary, the concession will include the right of the concessionaire to realize and exploit one, two or three innovative WTG’s for the duration of the WTG lifetime but with a minimum period of at least five years. The parties will discuss and agree on the rights during the exploitation period, and the principles will be agreed after conclusion of the concession period for the realized works.

As an option, the concessionaire may also realize the foundations for such WTG’s.

The power generated by the works during exploitation period will be off-taken by Q10 or a subsidiary.

WTG of minimum 4 MW will need to be:

1. certified as a Prototype Class C onshore WTG according to the IEC Type Certification System at the time of contract signing,

2. producing power to the grid on at least one onshore location at the time of application for pre-qualification for this tender,

3. out of serial production,

4. with a maximum rotor diameter of 115m.

WTG’s that are already fully certified and commercially available are not considered to be innovative. The WTG’s must comply within the boundaries of the requirements of the permit that has been obtained by Q10.

Q10 intends to appoint the preferred concessionaire no later than 30 April, 2012 (without any obligation to actually award the contract which is foreseen not later than September 2012).

The Q10 offshore wind farm is located in the Dutch EEZ, approximately 23km from shore near the coastal town Noordwijk. The wind farm will be connected to shore via a high voltage export cable that will be connected to the grid in Sassenheim.

[mappress]

Offshore WIND staff, January 13, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free