Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Buccaneer Starts Gas Production at Kenai Loop (USA)
Clean Fuel

January 16, 2012 · about 14 years ago

Buccaneer Starts Gas Production at Kenai Loop (USA)

Buccaneer Energy Limited announced that production from its Kenai Loop # 1 well commenced on 14 January 2012. The Company anticipates producing the well at up to 5.0 million cubic feet per day (MMCFD) for the first 2-3 months while reservoir performance is monitored. The Company will be selling gas

2 minutes read
  • LinkedIn
  • X
  • Email

Buccaneer Energy Limited announced that production from its Kenai Loop # 1 well commenced on 14 January 2012.

The Company anticipates producing the well at up to 5.0 million cubic feet per day (MMCFD) for the first 2-3 months while reservoir performance is monitored. The Company will be selling gas into ENSTAR’s winter daily auction. The daily auction is a system where gas producers are advised of ENSTAR’s additional requirements for the next 24 hours and the producers bid the price and volume to sell gas to meet these requirements.

ENSTAR’s additional winter demand requirement during this period is primarily based on weather conditions and so can fluctuate on a daily basis.

The Company also has the ability to sell gas to ConocoPhillips under its gas sales agreement with the local LNG facility if the total daily production is not purchased by ENSTAR.

Buccaneer Director Dean Gallegos said:

“ The commencement of gas production and sales from the Kenai Loop project is a significant milestone for Buccaneer and marks the first production from our substantial Alaska holdings. We are extremely proud of the speed and efficiency our team has displayed in going from discovery to permitting and production at Kenai Loop in less than 9 months – this includes the construction of a pipeline and the facilities necessary to drill, produce and transport a substantial amount of natural gas.Buccaneer is looking forward to an active 2012 with drilling at Kenai Loop likely to commence in 2nd quarter 2012, prior to the start of its offshore program. ”

[mappress] LNG World News Staff, January 16, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free