Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Two Workers Missing, Rig Partially Collapsed in Fire Incident Offshore Nigeria
Business & Finance

January 18, 2012 · about 14 years ago

Two Workers Missing, Rig Partially Collapsed in Fire Incident Offshore Nigeria

Chevron Corporation said that an extensive search and rescue effort continues for two contractors who remain missing after a fire aboard the K.S. Endeavor, a drilling rig offshore Nigeria operated by FODE Drilling Nigeria Limited. “While Chevron s highest priority remains the rescue of the missing c

2 minutes read
  • LinkedIn
  • X
  • Email

Chevron Corporation said that an extensive search and rescue effort continues for two contractors who remain missing after a fire aboard the K.S. Endeavor, a drilling rig offshore Nigeria operated by FODE Drilling Nigeria Limited.

“While Chevron s highest priority remains the rescue of the missing contractors, the company continues to devote the necessary resources to resolve the rig incident in a responsible and timely manner.” said Chevron in a press release.

As previously reported, the K.S. Endeavor was drilling a natural gas exploration well for Chevron Nigeria Limited (CNL). The well is located in the Funiwa Field approximately six miles (10 kilometers) offshore and in approximately 40 feet (12 meters) of water.

Chevron reported that 152 workers on the rig and an associated barge were safely evacuated. They are now onshore and have been given medical examinations. Two remain hospitalized due to minor burns, while others are being held for further observation. .

While a full investigation is still underway, Chevron said initial indications point to the possible failure of surface equipment during drilling operations that led to a loss of well control. The well continues to burn and the rig has partially collapsed. At this time, the company cannot estimate how long the fire will continue.

Chevron has contracted with and is mobilizing the Transocean rig Baltic to commence drilling a relief well. Chevron said the time required to complete the relief well is uncertain, but could extend for some period. Chevron is deploying additional drilling experts and well control specialists to Nigeria to assist with well control efforts and the relief drilling process.

A small sheen is visible in close proximity to the well, which the company continues to evaluate. The sheen is estimated at approximately 13 barrels. Production from Chevron s North Apoi platform remains shut in since it is situated in close proximity to the incident. Total production from the platform was approximately 2,000 barrels per day.

CNL owns a 40 percent interest in the well and the Nigerian National Petroleum Corporation has a 60 percent interest.

[mappress] Offshore Energy Today Staff, January 17, 2012; Image: Chevron

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free