ACD said that it has received an order from TGE Marine Gas Engineering to supply LNG fuel gas supply pumps for the new LNG carrier from MEYER WERFT GmbH.
The new tanker will transport liquefied natural gas with a cargo capacity of 15,600 cbm. The vessel will be Bureau Veritas (BV) classified and meet the highest environmental standards.
Delivery of the LNG fuel gas supply pumps is slated for May 2012 with the new vessel delivery scheduled for the end of 2012. The fuel supply pumps, ACD model TC-34, are submerged pumps designed to supply LNG from the cargo tank through a vaporizer system and feed low pressure natural gas to MAN’s 4-stroke engine.