Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Heerema Wins Ichthys Offshore Installation Job
Business & Finance

February 13, 2012 · about 14 years ago

Australia: Heerema Wins Ichthys Offshore Installation Job

McDermott Australia (McDermott) has recently awarded Heerema Marine Contractors Australia Pty Ltd (HMC) a contract to transport and install infield flowlines, subsea structures and moorings for the INPEX Ichthys LNG Project. McDermott Australia has been appointed the main contractor for the subsea u

2 minutes read
  • LinkedIn
  • X
  • Email

McDermott Australia (McDermott) has recently awarded Heerema Marine Contractors Australia Pty Ltd (HMC) a contract to transport and install infield flowlines, subsea structures and moorings for the INPEX Ichthys LNG Project.

McDermott Australia has been appointed the main contractor for the subsea umbilical, riser, flowline (SURF) project by INPEX. McDermott will work with HMC on the complex offshore installation campaign. HMC will carry out the transportation and installation of a portion of the offshore scope, utilizing the heavy lift, J-Lay and Reel-Lay capability of Heerema’s new-build vessel Aegir.

Scope of work

HMC’s scope of work includes the transportation and installation of flowlines, production flowlines, integrated pipeline structures, large subsea structures, a subsea riser support structure, and moorings for future FPSO and CPF facilities.

All pipeline production welding, both onshore and offshore, will be carried out by HMC’s subsidiary Pipeline Technique Ltd.

The project logistics are of an unprecedented scale in HMC’s subsea track record. It involves lowering over 100,000 tonnes of project materials to the seabed in water depths up to 275 meters.

HMC’s Executive Vice President Commercial & Technology Steve Preston says : “This is a really exciting opportunity for us, not only because of the enormous scope of the project, but also because we will be able to demonstrate the groundbreaking capabilities of our new vessel Aegir. We will be able to use its heavy lift, J-Lay and Reel-Lay capabilities all in one project.”

The Ichthys LNG Project is a Joint Venture between INPEX (76%, the Operator) and Total (24%). Gas from the Ichthys Field, in the Browse Basin approximately 200 kilometers offshore Western Australia, will undergo preliminary processing offshore to remove water and extract condensate. The gas will then be exported to onshore processing facilities in Darwin via an 889-kilometer subsea pipeline. The Ichthys LNG Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per year, along with approximately 100,000 barrels of condensate per day at peak.

[mappress] Offshore Energy Today Staff, February 13, 2012; Image: INPEX

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free