Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›First Marine Engineering Contract in China for SENER
Business & Finance

February 16, 2012 · about 14 years ago

First Marine Engineering Contract in China for SENER

SENER has signed a contract in Shanghai with CSDDC (China Ship Development and Design Center) and CSOC (China Shipbuilding & Offshore International Co. Ltd) for the joint design of a pelagic and bottom stern trawler. Once built, the fishing vessel will be operated by the company CNFC (China National

2 minutes read
  • LinkedIn
  • X
  • Email

SENER has signed a contract in Shanghai with CSDDC (China Ship Development and Design Center) and CSOC (China Shipbuilding & Offshore International Co. Ltd) for the joint design of a pelagic and bottom stern trawler.

Once built, the fishing vessel will be operated by the company CNFC (China National Fisheries Corporation) in the fishing-grounds of the coast of West Africa. This project represents an important milestone for SENER because it is the first marine engineering contract achieved in China.

The scope of the project to be developed by SENER includes conceptual and classification engineering and selection of the most important equipments of the vessel. The design is an important technological challenge for SENER, as it combines a bottom trawl (sole, squid, toothfish, etc) with pelagic trawl (scad, sardine, etc) and includes processing plants, freezing and storage for both fishing procedures. It is estimated that work will begin in March 2012 and will be completed by the end of the year. The project is going to be developed with 3D CAD/CAM system FORAN.

Among the most important requirements of the trawler, which will have an overall length of 75 meters, highlights its capacity, with fuel tanks of 600 tons, fish holds of 2,000 m3 (with refrigerating temperature of -28 ° C and freezing temperature of -40 ° C) and a fishmeal hold of 300 m3. The ship will have processing plant equipment for pelagic trawl of 10 tons per day, bottom trawl of 120 tons per day, and also a fishmeal machine with a daily processing capability of 50 tons. The free navigation speed will be 13 knots while the drag speed will be more than 5.5 knots for pelagic trawl and 4.5 knots for bottom trawl. It will have a crew of 45 people.

[mappress]

World Maritime News Staff, February 16, 2012; Image: SENER

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free