Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Technology›China: XEMC Installs 5MW Wind Turbine Prototype
Technology

March 29, 2012 · about 14 years ago

China: XEMC Installs 5MW Wind Turbine Prototype

According to Whats on Xiamen, the south-eastern Chinese province, Fujian got the first 5MW direct-drive permanent magnetic offshore prototype. The prototype has been installed by XEMC, in a land surrounded by the sea in three sides in Dongsha village, Sanshan town of Fuqing city, Fujian province. Th

2 minutes read
  • LinkedIn
  • X
  • Email

According to Whats on Xiamen, the south-eastern Chinese province, Fujian got the first 5MW direct-drive permanent magnetic offshore prototype. The prototype has been installed by XEMC, in a land surrounded by the sea in three sides in Dongsha village, Sanshan town of Fuqing city, Fujian province.

This step represents a follow up to the project, carried out by XEMC Darwind, a subsidiary of XEMC, in September 2011, when 5MW prototype was installed in the Netherlands. It is ranked among the first multi-megawatt offshore-dedicated direct-drive PMG-type turbines.

XEMC Darwind is engaged in development and construction of high-end multi megawatt wind turbines, based on Direct Drive Permanent Magnet generator technology. It represents a combination of Dutch heritage in production of high design integrity and Chinese production of electro-traction systems.

The alliance seems to be a winning combination since it paved the way for closing of a very favourable deal with Windkraft FIT, a German developer with headquarters in Hamburg. The counterparts agreed on offshore supply and installation amounting to 50MW that will take the form of 10 5MW XD115/5MW direct-drive turbines.

These units will be built within the framework of a project, dubbed Albatros 1. The project will herald construction of the first offshore turbines in Europe which originate from China. The contract is worth between €70-90 million, with the overall capacity of 474MW.

Completion of Albatros 1 is expected until the end of 2015.

[mappress]

Offshore WIND staff, March 29, 2012; Image: xemc

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago