A contract has been awarded to Kongsberg Maritime Ltd to conduct underwater noise studies for an offshore renewables project that could eventually lead to 400MW being installed in the Inner Sound of the Pentland Firth.
The contract, awarded by MeyGen Limited, will involve Kongsberg Maritime Ltd conducting both baseline and operational noise measurements from prototype tidal devices to assess the potential effects of underwater noise on marine life.