Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Main Cryogenic Heat Exchanger at PNG LNG Site Succesfully Lifted
Clean Fuel

April 17, 2012 · about 14 years ago

Main Cryogenic Heat Exchanger at PNG LNG Site Succesfully Lifted

The tallest structure at the PNG LNG Plant site outside Port Moresby was hoisted into place recently. Staff of Chiyoda JGE Joint Venture working with their subcontractors including Daewoo and Nippon Express installed the Main Cryogenic Heat Exchanger which stands at 54 metres tall. The heat exchange

1 minutes read
  • LinkedIn
  • X
  • Email

The tallest structure at the PNG LNG Plant site outside Port Moresby was hoisted into place recently. Staff of Chiyoda JGE Joint Venture working with their subcontractors including Daewoo and Nippon Express installed the Main Cryogenic Heat Exchanger which stands at 54 metres tall.

The heat exchanger was loaded at Motukea Island and arrived at the PNG LNG site 4 hours later (a trip normally done in 20 minutes) moving at 5 kilometres an hour. The load had a series of stops along the route to check load security and transporter condition.

The Main Cryogenic Heat Exchanger is the heart of the LNG plant and is where natural gas will be liquefied and sub-cooled. Warm gas will enter the bottom of the exchanger tube and will exit at the top in a sub-cooled liquid state. The Main Cryogenic Heat Exchanger will convert gas temperatures to minus 160 degrees Celsius. This liquefied gas will then be shipped to overseas markets in tankers.

Esso Highlands Limited, the operator of the PNG LNG Project will begin exporting to markets in Asia in 2014. Gas will be transported from the Southern Highlands via a 700 kilometre pipeline.

[mappress]

LNG World News Staff, April 17, 2012; Image: PNG LNG

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free