Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›UK: Coastline Surveys Completes Two Vibrocore Campaigns for Hanson
Dredging

April 17, 2012 · about 14 years ago

UK: Coastline Surveys Completes Two Vibrocore Campaigns for Hanson

Coastline Surveys Ltd has recently completed two large Geotechnical Vibrocore campaigns for Hanson Aggregates Marine Ltd (HAML). The first work scope comprised 58 core locations offshore Norfolk. Specialist Geotechnical Survey Vessel, MV Flatholm, was mobilised and work scope completed with Coastlin

1 minutes read
  • LinkedIn
  • X
  • Email

Coastline Surveys Ltd has recently completed two large Geotechnical Vibrocore campaigns for Hanson Aggregates Marine Ltd (HAML).

The first work scope comprised 58 core locations offshore Norfolk. Specialist Geotechnical Survey Vessel, MV Flatholm, was mobilised and work scope completed with Coastline’s ‘High Powered Vibrocore, ‘C-Core-HP’, in 5m configuration, average recovery overall was 4 metres.

The second work scope comprised of 70 core locations, spread over four licence areas, offshore of Lincolnshire and North Norfolk, the furthest area being 27 miles off the North Norfolk coast. Overall, the work was completed port to port, Lowestoft, in less than 4 days with an impressive average recovery of 4m completed by the experienced team onboard.

This further demonstrates Coastlines unrivalled productivity rate and commitment to deliver an excellent product. The favourable weather allowed the vessel to remain on site overnight throughout the work scope, without requirement to return to port each evening.

Uniquely for a vessel of her size, this important ability reduces the likelihood of encountering poor weather (and therefore standby costs), maximises on-site time for the Client and reduces unnecessary steaming and fuel consumption – an increasingly important issue with new larger, higher powered (therefore high fuel consumption) vessels entering the market.

[mappress]

Dredging Today Staff, April 17, 2012; Image: Coastline Surveys

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free