Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›UK: Coastline Surveys Completes Two Vibrocore Campaigns for Hanson
Equipment

April 17, 2012 · about 14 years ago

UK: Coastline Surveys Completes Two Vibrocore Campaigns for Hanson

Coastline Surveys Ltd has recently completed two large Geotechnical Vibrocore campaigns for Hanson Aggregates Marine Ltd (HAML). The first work scope comprised 58 core locations offshore Norfolk. Specialist Geotechnical Survey Vessel, MV Flatholm, was mobilised and work scope completed with Coastlin

1 minutes read
  • LinkedIn
  • X
  • Email

Coastline Surveys Ltd has recently completed two large Geotechnical Vibrocore campaigns for Hanson Aggregates Marine Ltd (HAML).

The first work scope comprised 58 core locations offshore Norfolk. Specialist Geotechnical Survey Vessel, MV Flatholm, was mobilised and work scope completed with Coastline’s ‘High Powered Vibrocore, ‘C-Core-HP’, in 5m configuration, average recovery overall was 4 metres.

The second work scope comprised of 70 core locations, spread over four licence areas, offshore of Lincolnshire and North Norfolk, the furthest area being 27 miles off the North Norfolk coast. Overall, the work was completed port to port, Lowestoft, in less than 4 days with an impressive average recovery of 4m completed by the experienced team onboard.

This further demonstrates Coastlines unrivalled productivity rate and commitment to deliver an excellent product. The favourable weather allowed the vessel to remain on site overnight throughout the work scope, without requirement to return to port each evening.

Uniquely for a vessel of her size, this important ability reduces the likelihood of encountering poor weather (and therefore standby costs), maximises on-site time for the Client and reduces unnecessary steaming and fuel consumption – an increasingly important issue with new larger, higher powered (therefore high fuel consumption) vessels entering the market.

[mappress]

Dredging Today Staff, April 17, 2012; Image: Coastline Surveys

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago