Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Ivory Coast: Rialto Resumes Gazelle Drilling
Project & Tenders

April 24, 2012 · about 14 years ago

Ivory Coast: Rialto Resumes Gazelle Drilling

Rialto Energy Limited, an exploration and production company focused on West Africa region, today announced that it has resumed drilling operations at the Gazelle-P3 ST Well, offshore Ivory Coast. Since the last report, the stuck pipe was freed to a depth of 870 metres MD, a cement plug was set and

1 minutes read
  • LinkedIn
  • X
  • Email

Rialto Energy Limited, an exploration and production company focused on West Africa region, today announced that it has resumed drilling operations at the Gazelle-P3 ST Well, offshore Ivory Coast.

Since the last report, the stuck pipe was freed to a depth of 870 metres MD, a cement plug was set and a sidetrack started. As of 12:00 GMT 23rd April, the well is drilling ahead at 1302 metres MD. The next casing point is at 1538 metres MD.

Rialto had informed the market on April 1 that the well was drilled to a depth of 1070m, at which point the drill-pipe became stuck and during the process of trying to free the drill-pipe, mechanical problems with the rig equipment occurred.

The Gazelle-P3 ST well was spudded on 12 March 2012 using the Transocean GSF Monitor jack-up drilling rig. The well is the first of an overall three well drilling programme on CI-202 that is anticipated to take six months to complete, together with testing.

[mappress] Offshore Energy Today Staff, April 24, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

18 days ago

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

18 days ago
WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago