Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Denmark: Avanti Presents Two Lifts at EWEA 2012
Offshore Wind

April 26, 2012 · about 14 years ago

Denmark: Avanti Presents Two Lifts at EWEA 2012

Europe’s primary event for the wind industry, EWEA 2012, in Bella Center in Copenhagen was a great success. More than 500 exhibitors and over 10.000 visitors joined the exhibition and conference. Avanti Wind System was among the exhibitors. The exhibition visitors had the opportunity to take a close

2 minutes read
  • LinkedIn
  • X
  • Email

Europe’s primary event for the wind industry, EWEA 2012, in Bella Center in Copenhagen was a great success. More than 500 exhibitors and over 10.000 visitors joined the exhibition and conference.

Avanti Wind System was among the exhibitors. The exhibition visitors had the opportunity to take a closer look at two of Avanti’s brand new Service Lifts, of Avanti’s Climb Assistance and of Avanti’s Fall Protection System.

The new Pegasus is a Rack and Pinion Service Lift guided by the ladder system in the wind turbine. The lift is pulled up and down through pinions geared by motors on the lift and a rack welded to the ladder system. The new Rack and Pinion Lift is developed by Avanti due to different internals design and tower dimensions, especially adapted for concrete towers of WTG.

The other newly designed Service Lift – Dolphin – is guided by wires. It has a sliding door that can be divided in an upper and a bottom part and the lift can be equipped with windows.

Both new Service Lifts have space for two technicians and their tools. And like the other Service Lifts from Avanti Wind System, the new Pegasus and Dolphin Service Lifts can be put into service already during construction and commissioning of the turbine with the benefit that the technicians making the final installations in the turbine do not have to climb up and down the ladders.

The lifts cannot run if the door is open, but when the lifts are brought to a standstill and the technician is secured on his hook, inspection and repair can be performed from the lift.

Avanti Wind Systems has produced more than 16.000 Service Lifts for wind turbines all over the world, which is more than half of those installed.

EWEA 2013 will be in Vienna, Austria in February 2013.

[mappress]

Offshore WIND staff, April 26, 2012; Image: avanti

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free