Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Denmark: Dredger “Helle Saj” Removed from Thorsminde Harbour
Dredging

May 9, 2012 · about 14 years ago

Denmark: Dredger “Helle Saj” Removed from Thorsminde Harbour

In the afternoon of the 21st of November of 2011, the dredger Helle Saj travelling through a dense fog, collided with her sister ship Tonne, just 400 meters off the harbour entrance of Thorsminde and sank. Although the ship was lost, fortunately there were no casualties. Koole Maritiem, just complet

2 minutes read
  • LinkedIn
  • X
  • Email

In the afternoon of the 21st of November of 2011, the dredger Helle Saj travelling through a dense fog, collided with her sister ship Tonne, just 400 meters off the harbour entrance of Thorsminde and sank.

Although the ship was lost, fortunately there were no casualties. Koole Maritiem, just completing a salvage project in Sweden, was awarded the contract to remove the wrecked vessel, which was located inconveniently and partly blocking sea traffic coming to and from the harbour of Thorsminde.

Mobilisation

While supply-vessel Amy was sailing from Sweden to the site, barge Maxi left the port of Ijmuiden with all necessary equipment, including a newly acquired crawler crane and excavator. Both vessels arrived at Thorsminde at the end of March 2012 and operations commenced shortly after.

Preparing the removal

To simplify the removal, several chains, two excavators and one crawler crane were utilized to relocate the submerged wreck to a shallow location. Although the dredger sank just four months before, the ship was already embedded significantly.

First pieces

Since the Helle Saj was equipped with an excavator, this object was removed first. So after its fatal dive, this was the first piece of metal to reach the surface again.

Weather conditions

All operations went according to plan, although bad weather conditions often prevented continuation. To ensure the safety of all staff, periods of inactivity had to be accepted.

Completion

Towards the end of April 2012 the last pieces of the vessel were recovered and placed on the barge. After completing this phase, a sonar survey confirmed a clean seabed and demobilisation commenced.

Helle Saj’s last voyage

The Maxi – carrying the remainders of Helle Saj – and the Amy returned in Amsterdam on the 22nd of April. All scrap was cut into smaller pieces and various materials were separated and forwarded to suitable yards.

[mappress]

Dredging Today Staff, May 9, 2012; Images: koole

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free