Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Australia: ConocoPhillips Drills Ahead at Boreas-1 Well
Project & Tenders

May 11, 2012 · about 14 years ago

Australia: ConocoPhillips Drills Ahead at Boreas-1 Well

Karoon Gas Australia Ltd advises that at 06:00 hours (WST) today, the Boreas-1 well was drilling ahead at 3908 m in a 12-1/4″ hole. Since the last report, drilling began in the 12-1/4″ section from the 13-3/8″ casing point at 2822m and has continued to the current depth. The Transocean Legend semi-s

2 minutes read
  • LinkedIn
  • X
  • Email

Karoon Gas Australia Ltd advises that at 06:00 hours (WST) today, the Boreas-1 well was drilling ahead at 3908 m in a 12-1/4″ hole. Since the last report, drilling began in the 12-1/4″ section from the 13-3/8″ casing point at 2822m and has continued to the current depth.

The Transocean Legend semi-submersible rig is drilling the exploration well, which is operated by ConocoPhillips. ConocoPhillips is the operator of the jointly held WA-314-P, WA-315-P and WA-398-P Browse Basin permits containing the previously announced Poseidon and Kronos gas discoveries. Karoon Gas Australia Ltd holds 40% of the permit WA-315-P and WA-398-P, and 90% of permit WA-314-P.

Boreas-1 is located approximately 4 kilometres south of Poseidon-1 in WA-315-P on a large tilted fault block which is part of the of the north-east trending structural high of the greater Poseidon structure. The objective of the well is to test the extent, presence and quality of reservoirs within the Boreas-1 fault block.

Upcoming Well Program

The exploration program, operated by ConocoPhillips, plans to utilise the Transocean Legend semi-submersible rig for the entire campaign and is expected to continue through 2013.

A minimum of five wells will be drilled during the exploration program. The principal objective of the exploration program is to better define the size and quality of the hydrocarbon accumulations within the exploration permits which contain the greater Poseidon trend.

The second well, Zephyros-1, is located in permit WA-398-P on a large tilted fault block approximately 8 kilometres south west of Kronos-1 discovery location. The third well, Proteus-1, is located in WA-398-P on a large tilted fault block approximately 14 kilometres south east of the Poseidon-1 discovery location. Additional well locations for the remainder of the program will be announced as they obtain joint venture approval.

[mappress] Offshore Energy Today Staff, May 11, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago