Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›‘Seven Borealis’ in Holland for Final Outfitting
Offshore Wind

May 15, 2012 · about 14 years ago

‘Seven Borealis’ in Holland for Final Outfitting

The ‘Seven Borealis’, Subsea 7’s flag ship, is currently in Rotterdam (the Netherlands) for final outfitting at the Huisman facilities. The vessel is the first customized version of Ulstein Sea of Solutions’ successful SOC 5000 vessel design and fully developed by the Netherlands based Ulstein desig

1 minutes read
  • LinkedIn
  • X
  • Email

The ‘Seven Borealis’, Subsea 7’s flag ship, is currently in Rotterdam (the Netherlands) for final outfitting at the Huisman facilities.

The vessel is the first customized version of Ulstein Sea of Solutions’ successful SOC 5000 vessel design and fully developed by the Netherlands based Ulstein design office. The vessel features an offshore mast crane which can lift 5000 mt and will be capable to perform both J-lay as S-lay operations.

‘Seven Borealis’ is the first Vessel of SOC 5000 Design:

In 2006/2007, Ulstein Sea of Solutions developed the SOC 5000 heavy lift vessel design. Early in 2012, ‘Seven Borealis’, the first vessel based on this design, set sail.

Originally contracted by Nordic Heavy Lift to Sembawang Shipyard in Singapore as a 5000 t heavy lift vessel, it has since been upgraded to a deepwater construction vessel for Subsea 7. Unlike the original SOC 5000 design, the ‘Seven Borealis’ incorporates a centre line pipelay firing line, enabled through lifting the vessel’s entire accommodation block and main crane. The vessel will also be equipped with a J-lay tower. The final outfitting of ‘Seven Borealis’ takes place in the Netherlands, and only a short distance from the designer’s offices.

[mappress]

Offshore WIND staff, May 15, 2012; Image: ulsteingroup

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free