The Methania liquefied natural gas carrier, with a capacity of 145,702 cubic metres, is due to arrive in the Zeebrugge LNG terminal on May 27, according to shipping data.
The liquefied natural gas carrier will probably load in a re-export cargo and depart from the Zeebrugge terminal next day.
The Zeebrugge LNG terminal is situated on a 30ha site in the outer port of Zeebrugge, Belgium.
It is operated by Fluxys LNG and has an annual throughput capacity of nine billion cubic meters (bcm) of natural gas.
[mappress] LNG World News Staff, May 21, 2012; Image: Port of Zeebrugge