Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›STX Holds Steel Cutting Ceremony for LNG Tanker (South Korea)
Clean Fuel

May 28, 2012 · about 14 years ago

STX Holds Steel Cutting Ceremony for LNG Tanker (South Korea)

The South Korean shipyard STX Offshore and Shipbuilding began steel cutting for the first high-tech ship a series of four liquefied natural gas (LNG) carriers. The ships will be built on a joint class of Russian Maritime Register of Shipping (RS) and Lloyd’s Register (LR) with the symbol KM (*) Ice2

2 minutes read
  • LinkedIn
  • X
  • Email

The South Korean shipyard STX Offshore and Shipbuilding began steel cutting for the first high-tech ship a series of four liquefied natural gas (LNG) carriers.

The ships will be built on a joint class of Russian Maritime Register of Shipping (RS) and Lloyd’s Register (LR) with the symbol KM (*) Ice2 AUT 1 OMBO EPP ANTI-ICE LI CCO ECO-S WINTERIZATION (-30) Gas carrier type 2G (methane) by order of Sovcomflot for Gazprom Global LNG, acting as charterer. RS will act as the leading society.

Membrane-type LNG carriers with a capacity of 170,000 cubic meters of liquefied gas will be equipped with a three-fuel diesel-electric propulsion plant, allowing to use LNG as fuel. The use of gas as fuel will significantly reduce emissions of NOx and SOx, which is a necessary requirement for modern ships within the tightening of international air emissions standards. Ships will be used for LNG carriage between the existing terminals, including year-round export of gas from Russia’s first LNG terminal – Sakhalin-2, and in the future – from the LNG terminal of the Shtokman gas condensate field.

For the purposes of project development RS surveyors received special training at the modern shipyards (South Korea, China) in respect of the LNG carriers building , as well as survey of LNG carriers in operation (United Arab Emirates, Singapore).

The ceremony was attended by representatives of RS, Gazprom Global LNG, SCF, STX Offshore and Shipbuilding and LR. Cutting metal for the second ship of series is scheduled for July 11, 2012.

[mappress] LNG World News Staff, May 28, 2012; Image: Sovcomflot

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free