Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›USA: KBR Scores Hoegh LNG Contracts
Project & Tenders

June 26, 2012 · about 14 years ago

USA: KBR Scores Hoegh LNG Contracts

KBR said that it was selected as Höegh’s preferred engineer to execute pre-FEED studies for two of its projects off the coast of Israel and offshore Australia. KBR will provide the pre-FEED study for the King liquefied natural gas-floating production storage and offloading (LNG-FPSO) facility curren

2 minutes read
  • LinkedIn
  • X
  • Email

KBR said that it was selected as Höegh’s preferred engineer to execute pre-FEED studies for two of its projects off the coast of Israel and offshore Australia.

KBR will provide the pre-FEED study for the King liquefied natural gas-floating production storage and offloading (LNG-FPSO) facility currently being evaluated for Noble Energy’s giant Tamar gas field off the coast of Israel. KBR has developed FPSOs that are in use worldwide and is recognized as one of the world’s leading providers of onshore LNG plants and FPSOs.

Höegh LNG awarded KBR a second FLNG pre-FEED study for an unnamed project offshore Australia. The four-month pre-FEED is intended to provide a Total Installed Cost (TIC) estimate for a two mtpa FLNG facility to enable further evaluation of the project. KBR will perform a cost estimate study, taking Höegh’s existing generic LNG FPSO FEED study and adapting the capex cost for the operator’s field-specific basis of design. Should the project economics prove viable, FEED could start as early as 4Q 2012.

Both projects will be performed in KBR’s London Operating Center, utilizing the company’s substantial and growing FLNG engineering capability spread over the London, Houston and Perth offices.

“ We are excited about providing the initial engineering work for an innovative LNG FPSO solution to support Höegh LNG’s already-developed concept ,” said Roy Oelking, KBR Group President, Hydrocarbons . “ We are pleased to work with Höegh LNG, Daewoo Shipbuilding & Marine Engineering Co., and the Tamar field owners in developing one of the first LNG FPSOs to come to market. KBR has been working with Höegh LNG since 2010 and we are confident that, together, we will help Höegh deliver the optimum solution for bringing Tamar gas to the market. ”

[mappress]

LNG World News Staff, June 26, 2012; Image: Höegh LNG

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago