Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Total to Use AGR’s RMR System (Australia)
Business & Finance

July 4, 2012 · about 14 years ago

Total to Use AGR’s RMR System (Australia)

TOTAL E&P Australia (Total) has signed up to use AGR’s Riserless Mud Recovery (RMR®) system. The contract is for two exploration wells to be drilled over the next year in the Browse Basin off North West Australia. Bernt Eikemo, AGR’s Vice President of the Enhanced Drilling Solutions (EDS) division (

2 minutes read
  • LinkedIn
  • X
  • Email

TOTAL E&P Australia (Total) has signed up to use AGR’s Riserless Mud Recovery (RMR®) system.

The contract is for two exploration wells to be drilled over the next year in the Browse Basin off North West Australia.

Bernt Eikemo, AGR’s Vice President of the Enhanced Drilling Solutions (EDS) division (Asia Pacific) , said: “AGR is delighted to be part of Total’s drilling team during the forthcoming exploration campaign. We hope that this is the start of a long, successful relationship with Total E&P Australia.”

He added: “Our previous experiences with several operators in the Browse Basin and the North West Shelf have shown that unconsolidated sand formations become much more benign when drilled with RMR® using a proper mud system.”

RMR® has been used by Total on several other projects internationally but this is the first time that the operator has used the system in Australia.

The main reason for using RMR® on these wells is to be able to drill through the unconsolidated sands of the Grebe Formation. It is renowned for stuck-pipe problems when drilling riserless using seawater and sweeps.

RMR® enables the use of weighted, engineered mud in the top-hole section. All mud and cuttings are returned to the rig with no discharge to the seabed. The top-hole section can be drilled more safely, quickly and with less impact on the environment.

RMR®, together with its sister technology the Cutting Transportation System (CTS™), has been deployed on more than 500 wells worldwide to date.

[mappress] Subsea World News Staff , July 04, 2012; Image: AGR

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago