Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›USA: USNS Zeus Vessel to Start Survey for Underwater Cable Project
Subsea

July 6, 2012 · about 14 years ago

USA: USNS Zeus Vessel to Start Survey for Underwater Cable Project

According to The Sacramento Bee, the Pentagon is devising plans to lay about $40 million underwater fiber-optic cable from Guantanamo Bay to South Florida because of the military’s preparations for detonations and other operations at the Navy base for the long term. Navy Capt. Kirk Hibbert stated: “

1 minutes read
  • LinkedIn
  • X
  • Email

According to The Sacramento Bee, the Pentagon is devising plans to lay about $40 million underwater fiber-optic cable from Guantanamo Bay to South Florida because of the military’s preparations for detonations and other operations at the Navy base for the long term.

Navy Capt. Kirk Hibbert stated: “It only makes sense to do if we’re going to be here for any period of time”.

American military notified the Cuban military to expect the USNS Zeus surveyor ship which will be the first step of the project.

The U.S. will update the current system they use with a more reliable one.

The Pentagon could not disclose the location where the cable would likely come ashore in South Florida after passing through the Windward Passage east of Cuba and emerging from the Atlantic Ocean.

An official added that the project could be easy to install and that the 600-nautical-mile link could be accomplished in six months.

The only place where the cable might be susceptible to sabotage is in shallow water, where it emerges to link to a land station. The rest of the cable would be deep underwater and in case of a malfunction or a cut in the cable, a repair boat could reel it back out and reconnect it.

[mappress]

Subsea World News Staff , July 06, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free