Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Australia: Technip Wins Balnaves Development Contract
Clean Fuel

July 10, 2012 · about 14 years ago

Australia: Technip Wins Balnaves Development Contract

Technip was awarded by Apache Energy Ltd a subsea installation contract worth approximately A$60 million (about €50 million) for the Balnaves oil field development, located in the Carnarvon Basin, offshore North Western Australia, at a water depth of approximately 135 meters. The contract includes t

2 minutes read
  • LinkedIn
  • X
  • Email

Technip was awarded by Apache Energy Ltd a subsea installation contract worth approximately A$60 million (about €50 million) for the Balnaves oil field development, located in the Carnarvon Basin, offshore North Western Australia, at a water depth of approximately 135 meters.

The contract includes the project management, design, engineering and installation of:

The field was discovered by Apache in 2009 during exploration and appraisal drilling in the Julimar-Brunello complex. Balnaves is a light, sweet oil accumulation in a separate reservoir in the Triassic Mungaroo formation, located adjacent to the large gas reservoirs of the Brunello gas field.

First production from the $438-million development is scheduled in 2014, with gross peak production of approximately 30,000 barrels of oil per day and estimated gross recoverable resource of 17 million barrels of oil and 30 billion cubic feet of gas. Two horizontal production wells will be connected to a floating production, storage and offloading (FPSO) vessel via subsea tiebacks. One water injection well will be used to maintain reservoir pressure. Gas will be reinjected into another reservoir for later production as part of the Wheatstone liquefied natural gas (LNG) Project.

Technip’s operating center in Perth, Australia, will execute the contract, with engineering to commence immediately. The project is scheduled to be completed during the second half of 2013. Technip’s new-built multipurpose installation and construction vessel, the Deep Orient, will be used during the offshore campaign and will commence operations in 2013.

[mappress] LNG World News Staff, July 10, 2012; Image: Apache

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free