Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Freeport LNG Inks Liquefaction Tolling Deals with Osaka Gas and Chubu (USA)
Project & Tenders

July 31, 2012 · about 14 years ago

Freeport LNG Inks Liquefaction Tolling Deals with Osaka Gas and Chubu (USA)

Freeport LNG Expansion said that it had executed 20-year liquefaction tolling agreements with Osaka Gas and Chubu Electric Power covering 100% of the liquefaction capacity of the first train of Freeport LNG’s proposed natural gas liquefaction and LNG loading facility near Freeport, Texas. The initia

2 minutes read
  • LinkedIn
  • X
  • Email

Freeport LNG Expansion said that it had executed 20-year liquefaction tolling agreements with Osaka Gas and Chubu Electric Power covering 100% of the liquefaction capacity of the first train of Freeport LNG’s proposed natural gas liquefaction and LNG loading facility near Freeport, Texas.

The initial 3-train facility will be capable of liquefying approximately 13.2 million tons per annum of natural gas. Freeport LNG expects that all three trains will be fully subscribed by the end of 2012.

Osaka Gas / Chubu Electric Agreements

Pursuant to the agreements with Osaka Gas and Chubu Electric, the Japanese utilities have acquired rights to the 4.4 mtpa production capacity of the first train at Freeport over an initial 20-year term. “We welcome the unparalleled LNG industry expertise and experience that Osaka Gas and Chubu Electric bring to the Freeport LNG project,” said Michael S. Smith, Freeport LNG’s Chief Executive Officer. “As two of the largest natural gas and electric utility service providers in Japan, having liquefaction tolling agreements with Osaka Gas and Chubu Electric provides the strong end-user credit support necessary to fully finance the initial train of the liquefaction project.”

Trains 2 and 3

Freeport LNG is also under exclusive negotiations with respect to the second and third trains of the liquefaction project. Definitive agreements with respect to the second and third trains are expected to be completed before year-end. It is anticipated that, upon final investment decision, the first three trains will be constructed as the initial phase of the liquefaction project. The new liquefaction facilities will be integrated into the existing regasification facilities and operated as an integrated plant.

Project Update

Commencement of construction of Freeport LNG’s liquefaction project is subject to receipt of regulatory approvals and final investment decision by Freeport LNG. Key regulatory approvals include Federal Energy Regulatory Commission (FERC) authorization to commence construction and Department of Energy (DOE) approval to export LNG to countries with which the United States has not entered into a free trade agreement (FTA). Freeport LNG anticipates to receive all regulatory approvals by mid-2013, and to begin construction in the third quarter of 2013. The first train is anticipated to commence operations approximately 48 months from start of construction, with each subsequent train in operation 6-9 months after the previous train. Freeport LNG has contracted with Chicago Bridge & Iron and Zachry Construction to engineer, design and build the liquefaction project. Macquarie Capital is serving as Freeport LNG’s financial advisor with respect to the proposed financing.

[mappress] LNG World News Staff, July 31, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago