Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Alewijnse RETEC Romania Reaches Another Milestone
Equipment

September 10, 2012 · about 14 years ago

Alewijnse RETEC Romania Reaches Another Milestone

Alewijnse RETEC Romania has delivered recently its first designed, produced and commissioned complete electrical package together with the electrical propulsion system and static converter distribution on board of 750 cbm Hopper Dredger, built in Damen Shipyards Galati. Although the overall lenght o

2 minutes read
  • LinkedIn
  • X
  • Email

Alewijnse RETEC Romania has delivered recently its first designed, produced and commissioned complete electrical package together with the electrical propulsion system and static converter distribution on board of 750 cbm Hopper Dredger, built in Damen Shipyards Galati.

Although the overall lenght of the vessel is 59.20m, gross tonnage aprox 700GT, sustaining a crew of 10 persons, she has a very complex electrical installation. The vessel is equiped with 3x 476kW, 690V-60Hz generators, 2 x 200kW, 690V-60Hz / 400V/50Hz static converters, frequency drive water cooled electrical propulsion, dredge and jet pump. Alewijnse RETEC Romania delivered besides the complete electrical package and dredging control system, also the engineering, installing activity and the commissioning.

The team of 10 engineers led by an experienced senior project leader, in cooperation with the automation and commissioning departments, succeeded in combining high-tech equipments from world-renowned names in the naval field (Allen Bradley, Vacon, Schneider and Praxis) and to come up with a 100% Romanian achievement. This makes Alewijnse RETEC Romania the only supplier for this kind of electrical solution in Romania.

But the result did not come up easy. One of the main challenges was to solve the electro- magnetic incompatibility onboard. According to Mr. Gigi Saptelei, the Operational Manager of Alewijnse RETEC, it can be extremely challenging not to have electro- magnetic disturbances in a small space.

“Delivering this modern, more efficient electrical solution was a difficult task, but we are proud to have accomplished it ,” says Mr. Alexandru Munteanu, Senior project leader of this project . He also adds that the new electrical solution has a wide applicability range, should there be more demands for it.

Alewijnse RETEC Romania has been offering for 16 years full range of electrical services (from engineering to commissioning) for the electrical marine market, as well as electrical equipment and after sales services for the complete electrical system of a ship.

[mappress]

Press Release, September 10, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

13 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

13 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

13 days ago