Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›Denmark: Poseidon Commences Test Phase 3
Research & Development

September 14, 2012 · about 14 years ago

Denmark: Poseidon Commences Test Phase 3

On the early morning on September 5th 2012, Poseidon P37 was craned out back into sea to commence test phase 3. Poseidon will, once towed into position at the test site of Onsevig Harbor, at the north coast of Lolland, represent nothing less than a world premiere. For the first time ever, a hybrid e

2 minutes read
  • LinkedIn
  • X
  • Email

On the early morning on September 5th 2012, Poseidon P37 was craned out back into sea to commence test phase 3. Poseidon will, once towed into position at the test site of Onsevig Harbor, at the north coast of Lolland, represent nothing less than a world premiere. For the first time ever, a hybrid energy device will deliver power to the grid from wind and waves.

Test Phase 1, conducted 2008/09, had the purpose to document platform stability including the impact of the moving wave absorption floaters on overall platform stability. The test was successful and DTU/Risoe and DHI “green lighted” the installation of wind turbines on the platform.

Test Phase 2, conducted 2009/10, had the purpose to document power to the grid from wind turbines on the floating structure and to document the efficiency of the wave energy absorption floaters expressed as hydrodynamic efficiency to provide background data for the engineering of the final Power Take Off system (PTO)

Test Phase 3, started September 2012 has the purpose to jointly produce power to the grid – from the wind turbines and wave absorption floaters. The wave absorption floaters are equipped with a new PTO system designed in cooperation with Siemens Industry, Fritz Schur Energy, Contech and others.

The PTO system is a closed hydraulic system, where each floater will be an independent energy producing unit. Each float and adjacent PTO system will operate at power levels enabling the use of standard power generation components and each “unit” will be detachable from the platform to allow easy towing and in-harbor service.

During September, the platform will be re-equipped with wind turbines and the new power module installed. Everything is tested while Poseidon is still in the harbor – one of the beauties of the concept. Once all components and control systems are tested, Poseidon is towed back to its original position at sea at the Onsevig test site in early October to enjoy the Danish autumn storms.

[mappress]

Press release, September 14, 2012; Image: floatingpowerplant

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

14 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

14 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

16 days ago