Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Saudi Arabia: Officials Hold Berth 69 Project Opening Ceremony
Dredging

September 25, 2012 · about 14 years ago

Saudi Arabia: Officials Hold Berth 69 Project Opening Ceremony

Grand opening ceremony was held for steel pipe pile construction of Berth 69 Project of Yanbu Industrial Port of Saudi Arabia on September 13. The ceremony was attended by Zahrani as Deputy Director of the Port Authority of Yanbu Industrial Port of Saudi Arabia, Omar as representative of the Project

1 minutes read
  • LinkedIn
  • X
  • Email

Grand opening ceremony was held for steel pipe pile construction of Berth 69 Project of Yanbu Industrial Port of Saudi Arabia on September 13.

The ceremony was attended by Zahrani as Deputy Director of the Port Authority of Yanbu Industrial Port of Saudi Arabia, Omar as representative of the Project Owner, Chen Yangui as Deputy General Manager of CHEC (Saudi Arabia) and Wang Zheng as the executive director of Berth 69 Project.

On behalf of the Project Owner, Deputy Director Zahrani said CHEC was efficiently and professionally providing the best infrastructure contracting services for the people of Saudi Arabia as a world-renowned international engineering contractor. He believed the Owner and the Contractor would make concerted efforts to accomplish a model project.

On behalf of the Contractor, Chen Yangui said CHEC would closely cooperate with the Owner, properly complete construction with desirable quality and quantity, offer an excellent project to the people of Saudi Arabia and bring honor to the brand “CHEC”.

The first steel pipe pile was constructed and driven on the site after the ceremony. After nearly two hours of construction and driving, the first pile penetrated into the soil layer by 16m, which marked smooth commencement of Berth 69 Project of Yanbu Port.

[mappress]

Press Release, September 25, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free