Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Little Rock District: Corps Initiates Preventive Maintenance Program (USA)
Dredging

September 28, 2012 · about 14 years ago

Little Rock District: Corps Initiates Preventive Maintenance Program (USA)

The U.S. Army Corps of Engineers, Little Rock District will implement a new program of daily preventive maintenance at two Arkansas locks on the McClellan-Kerr Arkansas River Navigation System. Beginning Oct. 1, Trimble Lock, near Fort Smith, Ark., and Ozark Lock, at Ozark, Ark., will close for a fo

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Little Rock District will implement a new program of daily preventive maintenance at two Arkansas locks on the McClellan-Kerr Arkansas River Navigation System.

Beginning Oct. 1, Trimble Lock, near Fort Smith, Ark., and Ozark Lock, at Ozark, Ark., will close for a four-hour period daily to allow personnel to perform routine preventive and scheduled maintenance.

The maintenance period is from 8 a.m. to noon daily but may be delayed by as much as two hours to allow for the completion of a lockage. This allows lock operators the flexibility to complete a lockage prior to the beginning of the maintenance period.

During the maintenance period no lockages will occur. This will allow crews to concentrate on maintenance efforts. Signs will be posted at launching ramps, marinas and on the up and down stream ends of locks to inform the public of the changes in operating hours.

Recreational boaters are encouraged to use the public boat ramps to access the upstream or downstream portions of the MKARNS to avoid possible extended waiting times that may be experienced due to scheduled maintenance periods.

The system has operated essentially without interruption except for routine scheduled maintenance for more than 40 years, however, the Corps is seeing trends of constrained budgets, increasing breakdowns and increasing backlog of preventive maintenance. The implementation of daily maintenance periods should increase long-term availability of the facilities and reduce unscheduled outages.

The system is fully functional, and historical data indicates that the daily maintenance period should have minimal impact to commercial and recreational traffic. The maintenance program will be evaluated by the Corps annually.

The Corps also is developing a recreation lockage policy for the 2013 season. The policy will take into account special scheduled events and recreational boater needs.

[mappress]

Press Release, September 28, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free