Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›UK: Dredger “David Church” Renewed and Upgraded
Vessels

October 16, 2012 · about 13 years ago

UK: Dredger “David Church” Renewed and Upgraded

Dover Harbour Board’s (DHB) maintenance dredger David Church has recently undergone a comprehensive £485,000 refit to relife the vessel for another 15 years service. A full review of the dredger business unit was undertaken by Simon Moore, Duty Harbour Master and it was decided that the most cost ef

2 minutes read
  • LinkedIn
  • X
  • Email

Dover Harbour Board’s (DHB) maintenance dredger David Church has recently undergone a comprehensive £485,000 refit to relife the vessel for another 15 years service.

A full review of the dredger business unit was undertaken by Simon Moore, Duty Harbour Master and it was decided that the most cost effective option for the Port of Dover was to upgrade the vessel which was built by Appledore Ship Builders in 1995.

The project has focused mainly on renewing and upgrading all cargo equipment including dredge pipe, drag head, hydraulics, winches, discharge doors and crane. The majority of the refit refit works were completed by Smalls Shipyard of Lowestoft over a 3 week docking period. The crane refurbishment/upgrade was completed by the original manufacturer Pulleman (PLM) of Holland. The vessel sailed to Holland where the crane was lifted off at the PLM yard.

Other works included upgrades to the crew facilities, dredging software and navigation equipment. The vessel is manned by a dedicated crew of 5.

The David Church is unique in that she has the ability to both suction dredge and grab dredge and is ideally suited for working in the tight confines of a small port. The crane is a Pulleman PLM 50 which is dual purpose as it is fully certified as a lifting crane up to a maximum load of 15t at a radius of 6 metres. The David Church is now available to the market for charter and contract dredging.

[mappress]

Press Release, October 16, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

15 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

15 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

15 days ago