Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Norway: Seabed Template Helps in Recovering of 10 MBOE from New Fram Field
Subsea

October 18, 2012 · about 14 years ago

Norway: Seabed Template Helps in Recovering of 10 MBOE from New Fram Field

Together with its partners, Statoil is recovering approx. 10 million barrels of oil equivalent through the construction of a seabed template on the Fram H North structure. The seabed template is connected to the A2 template on Fram West, which transports production on to the Troll C platform. Fram H

2 minutes read
  • LinkedIn
  • X
  • Email

Together with its partners, Statoil is recovering approx. 10 million barrels of oil equivalent through the construction of a seabed template on the Fram H North structure.

The seabed template is connected to the A2 template on Fram West, which transports production on to the Troll C platform. Fram H North is the tenth fast-track project in Statoil’s portfolio.

“This project, which is one of the smallest fast-track developments on the Norwegian continental shelf, was made possible by means of standard solutions and fast-track principles to reduce time and costs,” says Halfdan Knudsen, project manager for field development in Statoil.

“The development of this field may be a door opener for new developments in the area as the licence partners have approved the installation of a 4-slot standard template to be used for additional targets or for tying back prospects in the event of discoveries. We’re excited about our continuing progress and optimistic with regard to what we’ll get out of this,” adds Knudsen .

Provisional estimates indicate that the field contains recoverable reserves of roughly 10 million barrels of oil equivalent. The installation of all the seabed equipment and laying of pipelines and control cables is planned for the summer of 2013. Drilling, which is due to start in the fourth quarter of 2013, will involve a well with two branches for the optimal draining of proven reservoir.

The project has been important for Fram operations in maintaining a high temperature in the flowline to the host platform, Troll C.

In this way we avoid using scale wax inhibitors in the pipelines between Fram and Troll C.

It also secures the production of oil and gas from acreage where there are considerable supplementary resources.

Fram H North is planned to come on stream in the third quarter 2014.

Facts about Fram H North – PL090 and PL248

– Location: North of Fram West in the Troll area.

– Licensees: Statoil has a 45% stake in PL090 and 60% in PL248. The remaining licensees in PL090 are ExxonMobil (25%), Gdf Suez (15%) and Idemitsu (15%), while Petoro owns 40% in PL248. The partners have negotiated a new coordinated solution for the field as it stretches over two licenses. This solution requires the final approval of the Ministry of Petroleum and Energy.

– Discovered in 2007.

– Included in Statoil’s fast-track portfolio in September 2011.

– Development solution: Standard seabed template for four wells. Connected by means of flexible pipeline to the existing template on Fram West A2.

– The contract for the construction of subsea production equipment has been awarded to FMC, while the contract for pipeline laying and installation was awarded to EMAS AMC earlier this year.

[mappress] Press Release, October 18, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free