Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›USA: BOEM Requests Public Comment on EA for OCS
Authorities & Government

November 1, 2012 · about 13 years ago

USA: BOEM Requests Public Comment on EA for OCS

The Bureau of Ocean Energy Management (BOEM) announced it is requesting public comment on an environmental assessment (EA) for the Wind Energy Area on the Outer Continental Shelf (OCS) offshore Massachusetts. The EA considers potential environmental impacts and socioeconomic effects from issuing ren

1 minutes read
  • LinkedIn
  • X
  • Email

The Bureau of Ocean Energy Management (BOEM) announced it is requesting public comment on an environmental assessment (EA) for the Wind Energy Area on the Outer Continental Shelf (OCS) offshore Massachusetts.

The EA considers potential environmental impacts and socioeconomic effects from issuing renewable energy leases and related site characterization activities within the Wind Energy Area. Site characterization activities include geophysical, geotechnical, archaeological and biological surveys needed to develop specific project proposals on those leases.

The EA also considers environmental impacts associated with potential site assessment activities, including installation and operation of meteorological towers and buoys, in support of leases that may be issued.

“Responsible development of abundant wind energy in places like offshore Massachusetts is a key part of the Obama Administration’s all of the above energy strategy,” said BOEM Director Tommy P. Beaudreau . “At the same time, we must ensure that the potential effects of wind energy development on other resources, such as marine mammals and fishing, are closely analyzed and that appropriate protections are put in place.”

BOEM is requesting public comments on the adequacy of the environmental analysis and of the measures designed to reduce or eliminate potential environmental impacts. BOEM will consider such comments before determining whether to issue a Finding of No Significant Impact, or conduct additional analyses under the National Environmental Policy Act.

[mappress]

Press release, November 01, 2012; Image: boem

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & Government

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

14 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

14 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

15 days ago