Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Comments Sought on Black Diamond Shoreline Program (USA)
Dredging

November 9, 2012 · about 14 years ago

Comments Sought on Black Diamond Shoreline Program (USA)

The Washington Department of Ecology (Ecology) is seeking public comment on Black Diamond’s recently updated shoreline master program. The proposed update will guide construction and development along a total of 6.6 miles of shoreline on Lake Sawyer and Covington Creek in Black Diamond. It combines

2 minutes read
  • LinkedIn
  • X
  • Email

The Washington Department of Ecology (Ecology) is seeking public comment on Black Diamond’s recently updated shoreline master program.

The proposed update will guide construction and development along a total of 6.6 miles of shoreline on Lake Sawyer and Covington Creek in Black Diamond. It combines local plans for future development and preservation with new development ordinances and related permitting requirements.

Black Diamond’s shoreline program is locally tailored to minimize environmental damage to shoreline areas, reserve appropriate areas for water-oriented uses, and protect the public’s right to public lands and waters.

Under Washington’s 1972 voter-approved Shoreline Management Act, Ecology must review and approve Black Diamond’s proposed shoreline program before it takes effect. More than 200 cities and counties statewide are updating or crafting their master programs.

Comments on Black Diamond’s proposed shoreline program will be accepted through Dec. 21, 2012.

Black Diamond’s proposed updated master program:

– Integrates the city’s shoreline regulations with its growth management, planning and zoning, floodplain management and critical areas ordinances as part of a unified development code. Establishes protective buffers of 40 to 100 feet, with the flexibility to reduce buffers based on individual property circumstances.

– Limits the length of new residential docks and piers to the minimum necessary, up to 60 feet.

– Encourages soft-bank erosion control methods and limits construction of new shoreline armoring.

– Includes a restoration plan showing where and how voluntary improvements in water and upland areas can enhance the local shoreline environment.

Washington’s cities and counties with regulated shorelines must update their programs by December 2014.

[mappress]

Press Release, November 9, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free