Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Carbon Trust to Conduct Offshore Wind Cable Study (UK)
Business & Finance

November 12, 2012 · about 13 years ago

Carbon Trust to Conduct Offshore Wind Cable Study (UK)

Carbon Trust is planning to conduct the offshore wind cable study. A significant number of UK offshore wind farms have experienced difficulties associated with the installation and burial of intra-array cables. In 2011, the OWA commissioned a study to develop recommendations for optimised cable inst

2 minutes read
  • LinkedIn
  • X
  • Email

Carbon Trust is planning to conduct the offshore wind cable study.

A significant number of UK offshore wind farms have experienced difficulties associated with the installation and burial of intra-array cables. In 2011, the OWA commissioned a study to develop recommendations for optimised cable installation methodologies that could be applied to large wind farms such as the UK Round 3 developments. As a novel alternative to J-tubes, it was recommended that the feasibility and benefits of a cabling design involving free-hanging cables attached to the turbine platform be explored. The cables (dynamic or static cables) would therefore have to be designed for dynamic conditions. This novel alternative is a potential solution to reduce installation cost and has been used in Oil and Gas applications.

The cable would be connected to the platform and would be left free-hanging to the seabed, requiring use of dynamic cable designs. Cable suppliers have already confirmed the feasibility of such a cable design and the OWA Cables Technical Working Group would like to better understand the benefits.

The objectives of this study are to:

– Examine the limits, benefits and risks of using free-hanging cables to connect offshore wind turbines;

– Consider the feasibility of static cables in dynamic environments (typical of subsea conditions) and design changes that may be required to make this possible;

– Evaluate the technological, engineering and supply chain risks;

– Identify potential mitigation strategies;

– Provide a detailed assessment of the construction, installation, HSE and operation and maintenance;

– Understand fatigue and mechanical strain;

– Determine the capital and operating cost implications and any potential impact on schedule.

[mappress] Subsea World News Staff , November 12, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago