Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Carlsbad Beach Restoration Resumes Soon (USA)
Dredging

November 14, 2012 · about 14 years ago

Carlsbad Beach Restoration Resumes Soon (USA)

At approximately 4:30 p.m. on the afternoon of November 7, an incident involving efforts to clear a clogged onshore pipe occurred at the Fletcher Cove worksite in Solana Beach. There were no injuries as a result of the accident. Great Lakes Dredge and Dock Company immediately shut down work on the p

2 minutes read
  • LinkedIn
  • X
  • Email

At approximately 4:30 p.m. on the afternoon of November 7, an incident involving efforts to clear a clogged onshore pipe occurred at the Fletcher Cove worksite in Solana Beach.

There were no injuries as a result of the accident. Great Lakes Dredge and Dock Company immediately shut down work on the project to assess the situation and launched an investigation to find out more details related to the cause of the accident. The SANDAG Construction Management Team also is undergoing a safety review. At this time, SANDAG and Great Lakes Dredge and Dock Company agree that the methods undertaken to clear the clogged pipe will not be employed again on this project.

Several construction related activities will occur over the next few days, including moving equipment such as bulldozers on the beach, repair and movement of pipe from Oceanside Harbor to South Carlsbad, deploying divers for work in South Carlsbad and Solana Beach, and movement of tug boats and other vessels. None of this work will involve active dredging or the placement of material. However, these efforts will be undertaken to prepare the contractor and equipment for the potential placement of material.

Safety is of the utmost priority and active dredging will not occur until SANDAG is satisfied with the plan to resume construction on the project. Sand replenishment at Fletcher Cove in Solana Beach began on November 4 and was scheduled to last approximately six days. Equipment mobilization, including placement of a large offshore pipe on the beach began in late October. Once the project resumes construction, work will be completed in the cities of Solana Beach and Carlsbad.

South Carlsbad

Approximately 140,000 cubic yards of new sand will be placed starting near the Palomar Airport Rd. and Carlsbad Blvd. intersection and extending south roughly 2,200 feet. To prepare, an onshore pipe has landed on the beach and will remain in place for the duration of the project.

North Carlsbad

Placement of approximately 200,000 cubic yards of new sand is expected to begin in late November and last eleven days. Sand replenishment will extend south from the Buena Vista Lagoon and end near Carlsbad Village Drive.

[mappress]

Press Release, November 14, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free