Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Housatonic River Dredging Underway (USA)
Dredging

November 14, 2012 · about 14 years ago

Housatonic River Dredging Underway (USA)

The Stratford Waterfront and Harbor Management Commission in coordination with the US Army Corps of Engineers announces that the Housatonic River is being dredged. The last time Connecticut’s second longest river was dredged was in 1976. “Leading the efforts to dredge the Housatonic River to improve

2 minutes read
  • LinkedIn
  • X
  • Email

The Stratford Waterfront and Harbor Management Commission in coordination with the US Army Corps of Engineers announces that the Housatonic River is being dredged.

The last time Connecticut’s second longest river was dredged was in 1976.

“Leading the efforts to dredge the Housatonic River to improve safe navigation and promote economic development while at the same time protecting the environment, has been a major priority of the Stratford Waterfront and Harbor Management Commission”, says chairman Bill Rock.

For the past 13 years the Stratford Waterfront Commission has been coordinating the efforts of the US Army Corps of Engineers, the Federal Environmental Protection Agency, the State Department of Transportation, the Connecticut Department of Energy and Environmental Protection as well as local, state and federal officials, other related commissions and agencies, to move this project foreword.

Dredging will clear much of the sand washed down from up river, filling in some parts of the federal channel to depths as shallow as 2 or three feet from a previously dredged depth of 18 feet at low tide. This has created a menace to navigation.

Some 50,000 cubic yards of extensively tested clean sand will be dredged from specific areas located between the RT1 Devon Bridge to the mouth of the river and disposed in Long Island sound. The project’s cost is seven hundred and fifty thousand dollars which was obtained through state bonding by the Department of Transportation.

Funding for testing was obtained by the U.S. Army Corps of Engineers which owns the Currituck, the vessel that will be used to dredge the river. The sand will be “vacuumed” from the channel then placed in the Currituck’s hold and transported to the disposal site off shore of Long Beach to aid in protection for the beach from erosion.

Rigorous testing was conducted to obtain permits from the department of energy and environmental protection for this project.

[mappress]

Press Release, November 14, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free