Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›CPNL Engineering to Supply Cable Protection System for Offshore Wind Project in Germany
Subsea

November 15, 2012 · about 14 years ago

CPNL Engineering to Supply Cable Protection System for Offshore Wind Project in Germany

CPNL Engineering GmbH, a provider of cable protection equipment, announced that the firm will supply a complete cable protection system for use on the NSO offshore wind project of RWE, a leading utilities company in Germany. RWE is the first company to adopt the cable protection system in a complete

2 minutes read
  • LinkedIn
  • X
  • Email

CPNL Engineering GmbH, a provider of cable protection equipment, announced that the firm will supply a complete cable protection system for use on the NSO offshore wind project of RWE, a leading utilities company in Germany.

RWE is the first company to adopt the cable protection system in a complete offshore wind farm, as it was convinced that CPNL’s equipment was easier to assemble and install than any other system in the market. An absolute pre in this project is that CPNL Engineering produces all the equipment in Germany; with a higher product material quality standard and against ISO 9001 and 14001 conditions. Overall, CPNL Engineering is the only supplier that has full control of engineering, production and quality management processes, as all production facilities are within reach of the firm in Germany.

“The cable protection system of CPNL Engineering fits perfectly in this project where limited time is available for cable installation. The cable installations will benefit with our protectors as we are able to save up to 3 hours per cable entry”, said Ton Tuk, Director of CPNL Engineering.

The cable protection system of CPNL Engineering is a one of a kind, as it is the first system that can be adapted to any kind of cable project. The simple configured system consists of the strongest articulated pipes, an all-in-one centralizer (with clamp and seal), compact hang-off (sealed) and joint solutions. The protection equipment receives an increasing support from the market due to the simplicity of the products, the high product (material) quality, the cost saving aspect of the products at time of installation and maintenance, and the possibility to install the products in installation and post-installation stage.

CPNL Engineering has delivered to customers with positive references including Princess Amalia OWF, CT Offshore and Eneco.

[mappress] Press Release, November 15, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free