Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›U.S. Army Corps of Engineers: Deepwater Wind Comment Period Extended
Business & Finance

November 15, 2012 · about 13 years ago

U.S. Army Corps of Engineers: Deepwater Wind Comment Period Extended

The U.S. Army Corps of Engineers has extended the public comment period until Dec. 31, 2012 for those who want to submit comments on the Deepwater Wind proposal to construct five wind turbine generators and do other work off the southeast coast of Block Island, Rhode Island. The original 45-day comm

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers has extended the public comment period until Dec. 31, 2012 for those who want to submit comments on the Deepwater Wind proposal to construct five wind turbine generators and do other work off the southeast coast of Block Island, Rhode Island. The original 45-day comment period was scheduled to end Nov. 19. The public requested additional time to comment.

Deepwater Wind Block Island, LLC and Deepwater Wind Block Island Transmission System, LLC (known collectively as Deepwater Wind) are seeking a permit from the Corps in compliance with Section 10 of the Rivers and Harbors Act, which provides for federal regulation of any work in, or affecting navigable waters of the United States; and with Section 404 of the Clean Water Act, which regulates the discharge or fill of material in U.S. waters, including wetlands.

Deepwater Wind Block Island, LLC proposes to construct and maintain the Block Island Wind Farm (BIWF), a 30-megawatt offshore wind farm located in Rhode Island territorial waters. The BIWF will consist of five 6-megawatt wind turbine generators (WTG), a submarine cable interconnecting the five WTGs, and a 34.5-kilovolt submarine transmission cable from the northernmost WTG to an interconnection point on east-central Block Island where the cable will go ashore to a new substation built at the existing Block Island Power Company property.

In connection with the BIWF, Deepwater Wind Block Island Transmission System, LLC proposes to construct the Block Island Transmission System (BITS), a 34.5-kilovolt alternating current bi-directional submarine transmission cable from Block Island to the Rhode Island mainland. Deepwater Wind has submitted an Environmental Report as part of their application.

[mappress]

Press Release, November 15, 2012; Image: Deepwater Wind

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago