Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Leighton Completes Single Point Mooring Project in Tanzania
Business & Finance

November 19, 2012 · about 13 years ago

Leighton Completes Single Point Mooring Project in Tanzania

Leighton Offshore has successfully completed the Single Point Mooring System (SPM) installed for the Tanzanian Ports Authority (TPA) and the first tanker of imported white product (diesel) has been offloaded. The project is located South East of the Port of Dar Es Salaam and comprised the Design, En

2 minutes read
  • LinkedIn
  • X
  • Email

Leighton Offshore has successfully completed the Single Point Mooring System (SPM) installed for the Tanzanian Ports Authority (TPA) and the first tanker of imported white product (diesel) has been offloaded.

The project is located South East of the Port of Dar Es Salaam and comprised the Design, Engineering, Procurement, Fabrication, Installation and Pre-Commissioning of a replacement offshore SPM and pipeline system for the import of crude oil and white products with capacity for larger tankers up 150,000 DWT.

Leighton Offshore CEO Mr Boyd Merrett said, “ We are proud to have worked with the Tanzanian Ports Authority to complete this project which included a number of technical firsts, including a complete pigging of the system through the SPM and pipelines, and some challenging work in trenching through the intertidal zone” .

Leighton’s scope of work included:

– Offshore Marine Terminal System design, engineering and fabrication

– Procurement of all permanent and temporary materials and equipment including new SPM and dual pipeline systems

– Onshore right of way preparation and construction of one 24″ and one 28″ pipeline from beach crossing to onshore tank farm over 4km away

– Transportation, offshore trenching, SPM system installation including PLEM and mooring system as well as construction of the offshore pipelines.

– Subsea diver tie-ins, hook up works, system pre-commissioning and testing.

“This is an important facility for Tanzania and neighboring countries, and we are very pleased to have been part of this project development and are continuing to focus on East Africa as a market, where there are significant potential offshore oil and gas projects in early stages of development”, Mr Merrett said.

[mappress] Press Release, November 19, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago