Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen: New Sediment Transport Test Circuit Commissioned (The Netherlands)
Business & Finance

December 4, 2012 · about 13 years ago

Damen: New Sediment Transport Test Circuit Commissioned (The Netherlands)

Damen Dredging Equipment has commissioned the brand new sediment transport test circuit in the presence of the members of the Dutch Civil Engineering Society on the 24th of November last. The slurry test circuit is a part of the DDE innovation program, taking the search for better dredging component

2 minutes read
  • LinkedIn
  • X
  • Email

Damen Dredging Equipment has commissioned the brand new sediment transport test circuit in the presence of the members of the Dutch Civil Engineering Society on the 24th of November last.

The slurry test circuit is a part of the DDE innovation program, taking the search for better dredging components to the next level.

The sediment transport test circuit simulates the harsh conditions of a dredging project. Various types of equipment can be tested here on their durability. The test circuit includes a dredge pump, the dredge piping and the sediment storage unit – all assembled on a 40’ flatbed container frame. Due to the Ø 250 mm dredge piping, the circuit is one of the biggest test loops in the Netherlands. The standard test circuit length is 8 m, but additional piping or flexibles can be mounted when the space is available

The Ø 250 mm dredge piping has a good resemblance with the Damen product range, hence only minor scale effects occur. As more suppliers to the dredging industry need to investigate the durability and wear pattern of their components, the mobile unit can be shipped anywhere The test circuit can also be shipped to a dredge site for production and wear estimations on specific challenging projects.

The members of the Dutch Civil Engineering Society (Vereniging van Waterbouwers) visited the Nijkerk yard, where the festive commissioning of the circuit took place. After a good look around they all concluded that it is only logical the Dutch and dredging are mentioned in one breath.

[mappress]

Press Release, December 4, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago