Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Qatar: Weir Pumps Selected for New Doha Port Project
Dredging

December 10, 2012 · about 13 years ago

Qatar: Weir Pumps Selected for New Doha Port Project

Middle East Dredging Company (MEDCO) has selected Weir Minerals to supply pumps that will be used in the New Doha Sea Port dredging project, according to portfinanceinternational.com. This capital construction project will require approximately 45 million cubic metres of mainly hard rock to be dredg

2 minutes read
  • LinkedIn
  • X
  • Email

Middle East Dredging Company (MEDCO) has selected Weir Minerals to supply pumps that will be used in the New Doha Sea Port dredging project, according to portfinanceinternational.com.

This capital construction project will require approximately 45 million cubic metres of mainly hard rock to be dredged from a 20km long approach channel and the port’s basin.

Under this agreement, Weir Minerals will supply MECO with the heavy-duty skid-mounted pump assemblies, each incorporating a Warman 550 TUL slurry pump, a 1000 hp diesel engine, a gearbox and a heavy-duty bearing frame, reports worldpumps.com.

Tony G Locke, managing director of Weir Minerals Europe , stated: “This is a project on an enormous scale – the amount of solid rock that will be dredged would be enough to fill the Great Pyramid at Giza 18 times over or the Royal Albert Hall 500 times over.”

The New Port will be developed in several phases to include three container terminals with a combined annual capacity in excess of six million containers per year and a railway station connected to the GCC Railway Network, thus connecting the New Port to neighboring countries and opening horizons to serve the joint market of the Gulf States.

Middle East Dredging Company (MEDCO ) is a partnership between the Qatari company United Development Company (UDC, 45.1%), Qatar Holding (Government of Qatar, 10%) and DEME (44.1%).

Weir Minerals are specialists in delivering and supporting slurry equipment solutions including pumps, hydrocyclones, valves, screen machines and screen media, rubber and wear resistant linings for global mining and mineral processing, the power sector and general industry.

[mappress]

Dredging Today Staff, December 10, 2012; Images: DEME, Weir Minerals

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free