Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›South Korea: DSME Starts Float Joining of Allseas Pieter Schelte Project
Subsea

December 12, 2012 · about 13 years ago

South Korea: DSME Starts Float Joining of Allseas Pieter Schelte Project

DSME announced that the Hull No. 3401 Allseas Pieter Schelte Project’s float joining process started on 26th November. This is the biggest project ever constructed at the Okpo shipyard. It will be 328m long, 117m wide, and 30m high so it will completely fill the No.1 dock after the float joining. DS

2 minutes read
  • LinkedIn
  • X
  • Email

DSME announced that the Hull No. 3401 Allseas Pieter Schelte Project’s float joining process started on 26th November. This is the biggest project ever constructed at the Okpo shipyard. It will be 328m long, 117m wide, and 30m high so it will completely fill the No.1 dock after the float joining.

DSME won the Allseas project in 2010 and it will be the world’s biggest platform decommissioning and pipe laying vessel. The total weight will be approximately 240,000 tons so it is seven times bigger than a drilling rig. It is also possible for it to lift an offshore platform top side weighing up to 48,000 tons and install or decommission it on the sea. After delivery, its name will enter the Guinness Book of Records as the biggest vessel in the world.

DSME patented three methods of construction to assist with the float joining. The methods patented are the huge block joining technology on the float, the special equipment for the float joining, and the use of temporary rubber fenders. 12Y and 13Y, two huge blocks, were launched from the No.3 and No.4 Royal dock. These Blocks required adjusted accuracy on the float so the new block joining technology was needed.

DSME also developed special equipment such as a bumper guide and setting guide. These guides help to prevent collisions and made it easier to adjust the block level and improve welding accuracy. DSME also manufactured temporary rubber fenders and installed them on the hull side. They were useful for the tug boat when pushing and moving. They will be removed after the re-docking in the No.1 dry dock is finished which will help keep the construction on schedule.

[mappress] Press Release, December 12, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free