Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ABB Supplies HVDC Subsea Power Transmission System in Finland
Business & Finance

December 13, 2012 · about 13 years ago

ABB Supplies HVDC Subsea Power Transmission System in Finland

ABB, the leading power and automation technology group, has won an order worth around $130 million from Kraftnät Åland AB to supply a new power transmission link between the Finnish mainland and Åland. The high-voltage direct current (HVDC) transmission system will be capable of transmitting 100 MW

2 minutes read
  • LinkedIn
  • X
  • Email

ABB, the leading power and automation technology group, has won an order worth around $130 million from Kraftnät Åland AB to supply a new power transmission link between the Finnish mainland and Åland.

The high-voltage direct current (HVDC) transmission system will be capable of transmitting 100 MW (megawatts) of electricity with minimum losses across a distance of 158 kilometers.

The Åland archipelago, an autonomous Finnish province at the entrance to the Gulf of Bothnia in the Baltic Sea, presently receives its power through an AC (alternating current) cable from Sweden and local renewable sources. The existing fossil fueled power generation backup facility will be closed down once the new link is in operation. Apart from resolving the supply issue and reducing dependence on fossil fuels, the HVDC Light® link will enhance the contribution of renewables to the grid and help Finland reach its emission reduction targets.

“The link will enable the integration of more renewable energy, provide security of power supply and grid reliability to Åland,” said Brice Koch, head of ABB’s Power Systems division . “Our in-house manufacturing capability for converters, cables and semiconductors – the key components for HVDC – combined with our global track record will help us to deliver a best-in-class solution.”

ABB will design, engineer, supply and commission two 100 MW, ±80 kV (kilovolt) HVDC Light converter stations, one situated in Ytterby, Åland and the other in Nådendal, Finland. Two 80 kilovolt (kV) submarine cables, each 158 km long, will enable the transmission of power. The link is scheduled to become operational in 2015.

The HVDC system incorporates special features such as active AC voltage support providing greater network stability and the unique ‘black-start’ capability, which provides faster grid restoration in the event of a blackout. The system is DC grid enabled, ie, prepared for a multi-terminal configuration, which allows for additional in-feed from stations, such as future wind power plants.

HVDC Light technology enables underground and subsea transmission, and offers several environmental benefits, such as neutral electromagnetic fields, oil-free cables and compact converter stations. It is an ideal solution for connecting remote power sources like renewables to mainland networks, overcoming distance limitations and grid constraints, while ensuring robust performance and minimal electrical losses.

[mappress] Press Release, December 13, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago